Surrey · Established 2004

Sewage pumping stations across Surrey

Planned pump station servicing, packaged foul and surface water installations, and 24-hour emergency repair for large homes, managed blocks, schools, churches, factories and estates.

24/7 emergency coverEngineers and tankers available every day of the year, for high-level alarms and failed stations.
Planned maintenanceContracts of 12, 24 or 36 months, with two or four visits a year and a written report after each service.
Confined-space trainedEngineers are trained for confined-space working, including gas detection and breathing apparatus, with regular refreshers.
Established 2004Over 20 years’ experience in the installation, servicing and repair of pumping stations.

What we do

Servicing, emergency repair and installation

01

Pump station servicing

Planned pump station maintenance in Surrey, on contracts of 12, 24 or 36 months, with two or four visits a year. A major service is a 21-point mechanical and electrical check, with a written report afterwards. Tanker desilting and jetting can be built into the agreement.

Pump station servicing in Surrey
02

Emergency repair

24/7 emergency pump station repair when the alarm is going off, a pump has tripped, or the chamber needs a tanker. Engineers and tankers attend domestic and commercial sites every day of the year.

Emergency pump station repair
03

Installation

Packaged pumping station installation for foul and surface water, plus upgrades, refurbishment and sewage lifting stations where a site cannot drain by gravity.

Package pump station installation

Why it matters here

Foul water pumping stations on clay, hills and floodplains

A large part of Surrey sits on London Clay, on the North Downs and Surrey Hills, or on the floodplains of the Thames, Wey and Mole. Many sites cannot drain by gravity, so foul and surface water has to be pumped.

When a sewage pumping station is neglected, the first sign is often a high-level alarm — or water in a basement, a car park or a development road. We install packaged stations, keep existing ones on a planned maintenance contract, and attend with engineers and tankers when they fail.

We cover the county, including Guildford, Woking, Epsom, Reigate and Redhill, Leatherhead and Dorking, and Farnham and Camberley, and the towns around them.

Three Surrey Pump Services vans parked outside the company’s branded depot.
The Surrey Pump Services fleet outside the depot. Engineers and tankers cover the county from here.
Twin submersible sewage pumps installed in a wet well, with discharge pipework and valves visible above the water.
A twin-pump wet well on a service visit. The standby pump is only useful if it has been tested.

Planned maintenance

Most emergency call-outs start as something small

Rag and wipes catch on the impeller. Fats form a mat on the surface. Silt settles in the sump and jams a float. A non-return valve sticks open and the water that has just been lifted runs back into the chamber. None of these is dramatic on its own. Left alone, they are how stations end up in alarm at two in the morning.

A planned pump station servicing contract is the straightforward way to catch that early. Visits are arranged in a named calendar month. We work on equipment we installed and on other manufacturers’ stations. Tanker emptying, desilting and wet-well jetting can be built into the agreement.

Across the county

From the Surrey Hills to the Thames

Pump station engineers covering Guildford, Woking, Epsom, Reigate, Redhill, Leatherhead, Dorking, Farnham, Camberley and the towns between them.

Thames, Wey and MoleFlood-prone corridors where surface-water and sewage stations have little spare capacity in a storm.
London Clay and greensandHeavy soils and, in places, high groundwater — hard on chambers, floats and pump seals.
New-build and inherited stationsAdopted, unadopted and Section 104 stations on housing developments, plus older brick chambers on managed estates.

Next step

Tell us about the station

A make, a location and a brief description of the problem — or the planned install — is enough to start. If the chamber is in alarm or overflowing, please telephone rather than waiting on the form.