Servicing & maintenance

Pump station servicing and maintenance in Surrey

Planned visits that catch worn parts, rag, silt and failing floats before a high-level alarm. We maintain sewage and surface water pumping stations of any make, including stations we did not install.

Two blue submersible pumps in a rectangular wet well, with float switches along the wall and discharge pipework to one side.

Sewage pumping station maintenance that is actually planned

A service contract is more useful than a visit only after the station has failed. We offer preventative pump station maintenance contracts of 12, 24 or 36 months, with two or four visits a year, made up of a major service and a general service. Visits are arranged at a time that suits the site and completed within the agreed calendar month.

We maintain stations we installed and equipment from other manufacturers, regardless of make, design, age or condition — packaged GRP chambers as well as older brick or concrete wet wells. Service engineers are trained for confined-space working, including gas detection, breathing apparatus and confined-space entry procedures, and take regular refreshers.

Reports are filed online and are normally available within 24 hours. Contract customers can use their contract number to view scheduled visits, print reports and update contact information. Small consumable items — for example level-control floats, control panel fuses and indicator bulbs, up to a value of £150 — can be replaced on the visit and invoiced separately. Anything larger is reported with a recommendation before work goes ahead.

Twin submersible pumps in a wet well during a planned pump station service, with valves and discharge pipework above the water.
A twin-pump wet well on a planned visit. The standby pump is only useful if it has been tested.

What a pump station service includes

A major service is a 21-point mechanical and electrical check. The general service is a shorter version of the same inspection, without lifting and stripping the pumps unless something is wrong.

  1. Lift pump(s), clean the pump and check the data plate
  2. Check the pump volute for damage
  3. Check the impeller for debris and damage; unblock as required
  4. Check wear ring(s) for damage
  5. Assess motor and pump bearing condition
  6. Remove the oil drain plug and check the oil for water ingress, where appropriate
  7. Refit the drain plug with a new O-ring; refill or replace the oil where appropriate
  8. Check motor windings for continuity and insulation integrity
  9. Check motor cables for wear and water ingress
  10. Check and clean level-control floats or the ultrasonic head
  11. Check the condition and serviceability of the pump lifting system
  12. Check operation of isolation and non-return (reflux) valves
  13. Check the condition of wet-well pipework
  14. Check the wet well and valve chamber, including access covers
  15. Check the condition and serviceability of the pump control panel
  16. Check and adjust pump controls where necessary
  17. Check and test all safety and alarm facilities
  18. Check earth loop resistance
  19. Clean the control panel
  20. Check the condition of the control panel kiosk, where present
  21. Clean the chamber and remove items that could cause a blockage
A pumping station wet well being emptied with an orange tanker hose, with a thick mat of fat and debris on the water surface.
Tanker hose in a chamber matted with fat and debris. Wet-well emptying takes the load off the pumps and the level controls.

How often should a pump station be serviced?

It depends on how hard the station works. As a guide, a low-use domestic sewage pumping station is often well served by an annual visit. Shared stations on blocks, housing developments and commercial sites usually need two visits a year, and high-duty or heavily loaded stations may need four. We will say if a proposed schedule looks too light for the site.

In normal operation, grease floats and forms a mat at the top of the chamber, and solids settle at the bottom. Tanker pump-outs and high-pressure jetting can be built into a service contract, typically once a year, and more often on a busy site. A chamber that has not been desilted in years is one of the most common reasons a “serviced” station still goes into alarm a few weeks later.

Regular servicing reduces avoidable risk and finds developing faults. It does not guarantee that a pump will never fail — which is why contract customers also have a clear route to emergency pump station repair.

Pump station servicing across Surrey

The same planned-maintenance work is carried out in Guildford, Woking, Epsom, Reigate and Redhill, Leatherhead and Dorking, Farnham and Camberley, and the towns between them. The soils and rivers change; the need for a tested alarm and a clean chamber does not.

If you look after a private house, a managed block, a school, a factory or an estate and you are not sure when the pumps were last serviced, a first inspection is a sensible place to start.